|
The general scope of work for the main bridge structure (BIN 2-23204-0) are demolition of the entire two-span, reinforced concrete slab superstructure, and replacement with new two-span pre-stressed concrete slab units; demolition and replacement of existing center pier cap, steel columns, and reconstruction of the abutment walls for substructure. The superstructure includes deck slab, sidewalks, center median, parapets with fencing, lampposts and signal posts. |